Pro build generationPro build generation

The project involves the modernisation of DKS-5A Gazli through the replacement of existing gas turbine engines with new units. The upgrade is designed to improve the efficiency, reliability and safety of the station’s equipment while supporting continuous gas transportation.

<p>GAZLI: POWERING RELIABLE <br>GAS TRANSPORT</p>
  • Client

    TRANSGAZINJINIRING

  • Location

    Gazli, Bukhara Region, Uzbekistan

  • Period

    2025–2026

Scope of Work

The scope includes the replacement of gas turbine engines and the associated works required to integrate new equipment into the existing DKS-5A compressor station.
All works are carried out within an operating facility, where careful coordination is essential to maintain the continuity and reliability of gas transportation.

0.0 MN NM³/DAY

DESIGN CAPACITY

0%+

ENGINE EFFICIENCY

0 HOURS

DESIGNATED SERVICE LIFE

0

GAS SUPPLY DIRECTIONS
MODERNISING A LIVE GAS FACILITY
expert insight

Modernising an operating compressor station means balancing two priorities at every stage: introducing new equipment while maintaining the reliability and safety of the entire facility. That is what makes this project both technically demanding and critically important.

chief engineer

View all projects
1 - 4 OF 6
View all projects