The project involves the modernisation of DKS-5A Gazli through the replacement of existing gas turbine engines with new units. The upgrade is designed to improve the efficiency, reliability and safety of the station’s equipment while supporting continuous gas transportation.

Client
TRANSGAZINJINIRING
Location
Gazli, Bukhara Region, Uzbekistan
Period
2025–2026
The scope includes the replacement of gas turbine engines and the associated works required to integrate new equipment into the existing DKS-5A compressor station.
All works are carried out within an operating facility, where careful coordination is essential to maintain the continuity and reliability of gas transportation.
0.0 MN NM³/DAY
DESIGN CAPACITY0%+
ENGINE EFFICIENCY0 HOURS
DESIGNATED SERVICE LIFE0
GAS SUPPLY DIRECTIONS





Modernising an operating compressor station means balancing two priorities at every stage: introducing new equipment while maintaining the reliability and safety of the entire facility. That is what makes this project both technically demanding and critically important.


